Skip to content
Momentum Construction

Raised floor systems

Raised floors for offices, industrial facilities and data centers

A raised floor is built above the structural slab, leaving a void for power, data and air. Any panel lifts out to reach the services below. We supply, install, maintain and retrofit complete systems across Singapore.

How it's built

How is a raised floor system built?

Six layers work together. Rotate the model, pull the layers apart, switch any of them off, or lift a panel to see the services underneath.

Fig. 01 · Raised floor assembly · 600 mm module

Loading 3D model…

On site

From our installations

Installers fastening stringers and pedestals onto a heavy-duty steel understructure
Stringers and pedestals going onto a heavy-duty understructure
Data center raised floor on pedestals, with the underfloor void open at the edge
Data center floor, underfloor void left open for services
Finished raised floor in an electrical switch room
Finished floor in an electrical switch room

Applications

Where are raised floors used?

Grade A offices

Flexible power and data at every workstation, and layouts that change without chasing slabs.

Data centers

Underfloor cable routes and air distribution through grille panels.

Industrial & infrastructure

High, heavy-duty floors over dense cable layers, with structural steel support for equipment.

Government & healthcare

Durable, compliant systems for public buildings, hospitals and service centres.

Services

What do we do on raised floor projects?

01

New installations

Raised floor systems, understructures and finishes for commercial, industrial and data center spaces.

02

Maintenance & alignment

Maintenance and floor-alignment works for existing raised floor installations.

03

Replacement & retrofit

Floor replacement and retrofit works planned around the requirements of your next fit-out.

04

Used-material disposal

Disposal of used flooring materials as part of the scope for your existing floor works.

Specifying

What should you check before specifying?

Load requirements

For equipment and occupied areas.

Finished floor height

And the void depth your services need.

Fire performance

Our products are tested to CISCA and MOB standards in a Singapore lab and are SCDF compliant.

Finish

A bare panel with a separate covering, or a factory-finished panel.

For loading requirements or a product brochure, contact us.

Featured installation

1.7 m high, over a 5-tier cable layer

Momentum installers fitting raised floor panels over a deep steel understructure at IWMF

Ongoing · Infrastructure

Integrated Waste Management Facility (IWMF)

Raised flooring at a different level, literally

Read the case study